FA EN

Sarbisheh - Nehbandan gas transmission pipeline

Sarbisheh - Nehbandan gas transmission pipeline
Sarbisheh - Nehbandan gas transmission pipeline
Sarbisheh - Nehbandan gas transmission pipeline
Sarbisheh - Nehbandan gas transmission pipeline
Sarbisheh - Nehbandan gas transmission pipeline
Sarbisheh - Nehbandan gas transmission pipeline
Sarbisheh - Nehbandan gas transmission pipeline
Sarbisheh - Nehbandan gas transmission pipeline
Sarbisheh - Nehbandan gas transmission pipeline
Sarbisheh - Nehbandan gas transmission pipeline
On 05/22/2016, the contract for the 12-inch Sarbisheh Nahbandan pipeline project was signed between the Iran Gas Engineering and Development Company and Anhar Partnership, Aria Phoror Qoran. The general work description of the project is the 12-inch Sarbisheh-Nehbandan pipeline as an EPC with an approximate length of 127 km and a design pressure of 1050 pipeline from Sarbisheh station to Nehbandan in South Khorasan. The project in general and in brief includes completion review services. and validating basic design studies, performing detailed design services and product engineering services, providing goods and their documents, and implementing and installing 12-inch pipelines, cathodic protection stations, valve and launcher stations, receivers, and a gas pressure reduction station along with a branch station for the city of Shusuf.