On 23/08/2016, the EPC contract for the Arsanjan Gas Pressure Boosting Station project was signed to increase the capacity of the 8th national gas pipeline between Iran Gas Engineering and Development Company and Anhar Partnership, Aria Phoror Qoran. In normal mode, the facility is designed to transfer 108.1 million cubic meters of gas per day with an initial pressure of 993 and an outlet pressure of 1305 pounds per square inch. The construction site of the gas pressure boosting station is Arsanjan in Fars province and has geographic coordinates N=3292850 and E=717121. It has 4 gas turbo compressors.